Standards & Quality
A construction standard is only useful if the numbers behind it are written down, tested and handed over. This page sets out the published standards our work is based on, how we verify compliance, and what documentation you receive.
Standards our work is based on
Aerodrome design & airside works
Airside geometry and pavement design follow published international guidance, with the operator's own requirements taking precedence where they are more onerous.
- ICAO Annex 14, Volume I — Aerodrome Design and Operations: runway and taxiway geometry, obstacle limitation surfaces, markings and visual aids
- ICAO Doc 9157 Aerodrome Design Manual — pavement, visual aids and lighting guidance
- ICAO Doc 9137 Airport Services Manual — pavement surface conditions and friction
- FAA AC 150/5320-6 — pavement design and evaluation methods for airfield pavements
- FAA AC 150/5340-30 — airfield ground lighting installation guidance
- Operator and civil aviation authority requirements applicable to the specific aerodrome
Roads, earthworks & pavements
Road layer design and construction are set out against recognised pavement design and materials practice, confirmed by testing on the actual materials used.
- AASHTO pavement design methods and material specifications
- Kenyan road design and standard specification documents applicable to the works
- ASTM and AASHTO test methods for classification, strength and moisture-density relationships
- Compaction control against laboratory maximum dry density, verified in the field
- Bituminous mix design, production and placement testing
- Drainage design to the return period agreed and recorded for the project
Structures, concrete & materials
Structural work is designed and verified against established codes of practice and material test standards.
- BS and EN structural codes of practice, as applicable to the design basis adopted
- Concrete mix design, trial mixes and cube testing to the applicable BS/EN or ASTM method
- Reinforcement grade verification and placement inspection before concealment
- Structural steel fabrication, welding and erection tolerance standards
- Masonry, mortar and screed material testing
- Applicable Kenyan statutory building and planning requirements, confirmed per project
Electrical installations
Electrical installation design, inspection and testing follow established international practice, with results recorded circuit by circuit.
- IEC 60364 — low-voltage electrical installations: design, selection and verification
- IEC 60439 / IEC 61439 — switchgear and controlgear assemblies
- IEC 62305 — lightning protection principles
- Earth resistance, insulation resistance, polarity, continuity and loop impedance testing
- Luminaire and illuminance verification against the design lighting levels
- Applicable Kenyan electrical regulations and utility connection requirements
Mechanical & public health installations
Mechanical installations are pressure-tested, balanced and commissioned against the design duty before handover.
- EN and ISO standards applicable to pipework, ductwork and pressure testing
- Ventilation and air conditioning design, installation and balancing practice
- Water supply, storage and sanitary drainage design practice
- Fire-fighting installation design, pressure testing and flow verification
- Flushing, disinfection and water quality verification before handover
- Commissioning records against the specified design duty
Testing & verification
Where the project warrants it, verification testing is carried out by a laboratory independent of the construction team.
- An inspection and test plan agreed with the client before mobilisation
- Defined test frequencies per material, layer and activity
- Independent laboratory testing for load-bearing and airside elements
- Survey verification of levels, thickness and surface tolerance
- Non-conformance recording, assessment and formal close-out
- Calibration records for site test equipment
Independent checking
The person who produced a design is the worst person to check it. Where a failure would be structural, operational or safety-critical, we arrange for the design assumptions and calculations to be reviewed by someone who was not involved in producing them.
- Load-bearing structural design reviewed independently of the designer.
- Airside pavement design assumptions — traffic mix, subgrade strength, layer moduli — reviewed before construction.
- Drainage capacity assumptions checked against the agreed return period and catchment.
- Electrical protection and discrimination studies verified before energisation.
- Independent laboratory testing used in place of, or alongside, our own site testing where the project requires it.
Transparent documentation
You should be able to audit what we built after we have left. Our documentation is compiled as the work proceeds and handed over as a complete file.
- A written design basis stating every assumption used.
- All material test certificates and laboratory reports.
- Inspection records against each hold point in the test plan.
- Survey records of levels, layer thickness and surface tolerance.
- Electrical and mechanical test, commissioning and balancing certificates.
- As-built drawings reflecting what was actually installed.
- Operation and maintenance information, warranties and spares lists.
- A decision and variation log explaining why the works differ from the original design, where they do.